Title: PCB 73-015 06/14/73 Interim Opinion and Order
Summary: EXCHANGE NATIONAL BANK OF CHICAGO as trustee under its Trust No. 23787; CRYSTAL POINT OF LAKE FOREST, a limited partnership and beneficiary of said trust, and KATZ-WEISS CONSTRUCTION CORPORATION v. ENVIRONMENTAL PROTECTION AGENCY
Description:
Keywords:
Handle:
Document-37358
Owner:
Site Administrator (User-2, admin:DocuShare)DS
Create Date: Tuesday, March 18, 2003 02:48:38 PM CST
Modified Date: Tuesday, April 22, 2003 01:47:52 PM CDT
Modified By:
Site Administrator (User-2, admin:DocuShare)DS
Expiration Date:
Locked By:
Abstract: ILLINOIS POLLUTION CONTROL BOARD June 14, 1973 ) EXCHANGE NATIONAL BANK OF CHICAGO ) as trustee under its Trust No. The current average flow is 1.9 mgd. The plant provides alum treatment, primary sedimentation and chlorination. Petitioners’ contracted on July 31, 1969 to purchase the land for over $1,000,000. The petitioner has an investment in facilities intended to be used by the entire 6-building complex, We are cognizant of thatconstruction and the losses incurred in investment costs lying unutilized.1. Variance from the sewer connection ban order entered onM...
Add Versions: Allowed
Author:
Content Type:
Adobe Portable Document Format (.pdf) - application/pdf
File name: OCR0004.pdf
Is Placeholder:
Max Versions: 4
Size: 529257
Copied From:
Last Synchronized:
Ready for Declare: No
Appears In:
PCB 73-015
Preferred Version:
PCB 73-015 06/14/73 Interim Opinion and Order