June 7, 1973ENVIRONMENTAL PROTECTION AGENCY,Complainant,vs.
The request for reconsideration is timely and we
consider it on its merits.
Velsicol would like to be relieved of the bond requirement
since it has completed construction of the surface facility.
We feel that the posting
of the bond for a period of one year is a valid means of securingthe installation of equipment which will actually perform asrepresented and will achieve the desired results, i.e.
compliance
with the Regulation.
Allowed
Adobe Portable Document Format (.pdf) - application/pdf