View Properties

PCB 72-326 / PCB 72-351 06/07/73 Order
Handle: Document-37301
Owner: Site Administrator (User-2, admin:DocuShare)DS
Tuesday, March 18, 2003 11:23:37 AM CST
Thursday, July 28, 2005 09:53:00 AM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Saturday, December 30, 1899 12:00:00 AM CST
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
June 7, 1973ENVIRONMENTAL PROTECTION AGENCY,Complainant,vs.
  • The request for reconsideration is timely and we
consider it on its merits.
  • Velsicol would like to be relieved of the bond requirement
since it has completed construction of the surface facility.
  • We feel that the posting
of the bond for a period of one year is a valid means of securingthe installation of equipment which will actually perform asrepresented and will achieve the desired results, i.e.
  • compliance
with the Regulation.
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0004.pdf
4
172287
No
Appears In: PCB 72-326 PCB 72-351
Preferred Version: PCB 72-326 / PCB 72-351 06/07/73 Order