  • ILLINOIS POLLUTION CONTROL BOARD
August 5, 1976QUINCY SOYBEAN COMPANY, ) Petitioner,v.
  • ) PCB 76—113
ENVIRONMENTAL PROTECTION AGENCY, ) Respondent.
  • The current contract
authorizing this discharge expires on December 31, 1976 and willnot be renewed due to inadequate pumping capacity.
  • Quincy proposes a two gear
discharge of 5.5 MGD of water at an average temperature of 80 intothe final 1,500 feet of Curtis Creek prior to its confluence withthe Mississippi River.
  • The report concludes that the ditch is a
more balanced aquatic ecosystem than is the lower portion of theCreek.
  • The affidavit also considers the construction of a pipeline...