August 5, 1976QUINCY SOYBEAN COMPANY, ) Petitioner,v.
) PCB 76—113
ENVIRONMENTAL PROTECTION AGENCY, ) Respondent.
The current contract
authorizing this discharge expires on December 31, 1976 and willnot be renewed due to inadequate pumping capacity.
Quincy proposes a two gear
discharge of 5.5 MGD of water at an average temperature of 80 intothe final 1,500 feet of Curtis Creek prior to its confluence withthe Mississippi River.
The report concludes that the ditch is a
more balanced aquatic ecosystem than is the lower portion of theCreek.
The affidavit also considers the construction of a pipeline...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf