View Properties

PCB 79-174 09/06/79 Order
ELECTRIC ENERGY, INC. v. ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-31762
Owner: Site Administrator (User-2, admin:DocuShare)DS
Friday, December 27, 2002 11:37:16 AM CST
Monday, June 2, 2003 02:24:31 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
September 6, 1979ELECTRIC ENERGY, INC.,Petitioner,v.
  • ) PCB 79—174
ENVIRONMENTAL PROTECTION AGENCY,Respondent.
  • 1L0004171 pending the outcome of this matter:
a.
  • in attachment B—i, iron and copper load and concentration
limits and sampling requirements;h.
  • in attachment B—6, the requirement that sampling
be performed at a point representative of thedischarge but prior to entry into the receivingstream;c.
  • in attachment 8-8(a), all twice monthly sampling
requirements;d. in attachment 8-8(f), total suspended solidsconcentration limits and sampling requirementse. in attachment B—8(f), all sampling requirementsduring peri...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0005.pdf
4
204804
No
Appears In: PCB 79-174
Preferred Version: PCB 79-174 09/06/79 Order