ILLINOIS POLLUTION CONTROL BOARD
September 6,
1979
ELECTRIC ENERGY,
INC.,
Petitioner,
v.
)
PCB 79—174
ENVIRONMENTAL PROTECTION AGENCY,
Respondent.
ORDER OF THE BOARD
(by Mr.
Dumelle):
On August 24,
1979 Petitioner moved the Board to stay
the following terms and conditions of NPDES
Permit No.
1L0004171 pending the outcome of this matter:
a.
in attachment B—i,
iron and copper load and concentration
limits and sampling requirements;
h.
in attachment B—6,
the requirement that sampling
be performed at a point representative of the
discharge but prior to entry
into the receiving
stream;
c.
in attachment 8-8(a),
all twice monthly sampling
requirements;
d.
in attachment 8-8(f),
total suspended solids
concentration limits and sampling requirements
e.
in attachment B—8(f), all sampling requirements
during periods of floods;
f.
in attachment B—8(g), pH limits;
g.
in attachment B-40,
load limits for total suspended
solids,
iron (total), and oil
and grease and the
sampling requirement for total suspended solids
and the pH limits;
and
h.
in attachment
H,
standard conditions
3,
7,
8,
27,
28, and 29.
Petitioner also asked that all of the above listed
conditions which may be upheld not be effective until
30
days after the T3oard’s final decision
in this matter.
The motion is hereby granted in all respects.
35—33 9
—2—
IT IS
SO ORDERED.
I,
Christan L. Moffett,
Clerk of the Illinois Pollution
Control
B ard, hereby certify the above Order was adopted on
the
_____________
day of
—
,
1979
by a
vote
of
—
_____
o#,~IIJjs
Christan
L.
Moffet
,
lerk
Illinois Pollution
ntrol Board
35—340