September 6, 1979ELECTRIC ENERGY, INC.,Petitioner,v.
) PCB 79—174
ENVIRONMENTAL PROTECTION AGENCY,Respondent.
1L0004171 pending the outcome of this matter:
a.
in attachment B—i, iron and copper load and concentration
limits and sampling requirements;h.
in attachment B—6, the requirement that sampling
be performed at a point representative of thedischarge but prior to entry into the receivingstream;c.
in attachment 8-8(a), all twice monthly sampling
requirements;d. in attachment 8-8(f), total suspended solidsconcentration limits and sampling requirementse. in attachment B—8(f), all sampling requirementsduring peri...
Allowed