View Properties

Illinois Pollution Control Board Grants 45-day Provisional Variance to the City of Batavia
September 22, 2000 - The Illinois Pollution Control Board granted a 45-day provisional variance to the City of Batavia for its wastewater treatment facility located at 100 North Island Avenue, Batavia, Illinois. The provisional variance will allow the city to continue operating its wastewater treatment plant during the expansion of the facility. The work consists of installation of a new clarifier and a new ultraviolet disinfection system. Until the work is completed, the city has permission to operate using only one of its two clarifiers.
Handle: Document-86130
Owner: Site Administrator (User-2, admin:DocuShare)DS
Wednesday, October 8, 2014 09:19:18 AM CDT
Tuesday, October 14, 2014 03:26:55 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • For immediate release CONTACT: Andrew Boron
September 22, 2000 312/814-6062Illinois Pollution Control Board Grants 45-day Provisional Variance to theCity of BataviaChicago - The Illinois Pollution Control Board granted a 45-dayprovisional variance to the City of Batavia for its wastewater treatment facilitylocated at 100 North Island Avenue, Batavia, Illinois.
  • The work consists of installation of a new clarifier and
a new ultraviolet disinfection system.
  • This action, docketed as PCB 01-53, was taken by the Board upon
notification by the Illinois Environmental Protection Agency that compliancewith the effluent limits set forth...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
Illinois Pollution Control Board Grants 45-day Provisional Variance to the City of Batavia.pdf
No
1
9531
No
Appears In: Calendar Year 2000
Preferred Version: Illinois Pollution Control Board Grants 45-day Provisional Variance to the City of Batavia