View Properties

PCB 13-066 Order 060613
Handle: Document-80407
Owner: Brown, Don (User-14, brownd:DocuShare)DS
Friday, June 7, 2013 01:14:54 PM CDT
Friday, June 7, 2013 01:15:09 PM CDT
Modified By:
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
June 6, 2013PEOPLE OF THE STATE OF ILLINOIS,Complainant,v.
  • UNION PACIFIC RAILROAD COMPANY,
a Delaware corporation, and WALSHCONSTRUCTION COMPANY, an Illinoiscorporation,Respondents.
  • Adm.
  • Code 103.
  • In this case, the People allege that Union Pacific and Walsh Construction violated:
(1) Section 12(a) of the Act, 415 ILSC 5/12(a) (2012), by allowing storm water from the BridgeProject to run into Addison Creek; and (2) Section 12(d) of the Act, 415 ILSC 5/12(d) (2012), bynot providing adequate erosion control.
  • See 35 Ill. Adm. Code 103.204(c), (f),
103.212(c). A respondent’s failure to file an answer to a complaint within 60 days afterrec...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
PCB 13-066 Order 060613.pdf
No
1
27342
No
Appears In: PCB 2013-066
Preferred Version: PCB 13-066 Order 060613