BEFORE THE ILLINOIS POLLUTION CONTROL BOARDIN THE MATTER OF: )) PROPOSED AMENDMENTS TO ) EXEMPTIONS FROM STATE ) PERMITTING REQUIREMENTS ) FOR PLASTIC INJECTION MOLDING ) R 05 -20OPERATIONS ) (35 Ill.
CICI member facilities have
annual PIM resin throughput ranging from 100 tons/yr to 3,250 tons/yr.
Using the above information and the previous testimony that approximately 500
PIM facilities are located in Illinois, the formula for calculating statewide VOMem...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf