View Properties

PCB 04-040 Order 10/16/03
PREMCOR REFINING GROUP v. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY,
The Board granted this request for a 90-day extension of time to file an underground storage tank appeal on behalf of this Madison County facility.
Handle: Document-40460
Owner: Brown, Don (User-14, brownd:DocuShare)DS
Thursday, October 23, 2003 10:18:35 AM CDT
Friday, October 24, 2003 08:33:47 AM CDT
Modified By:
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
October 16, 2003PREMCOR REFINING GROUP,Petitioner,v.
  • ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,Respondent.
  • Adm.
  • Code 105.402, 105.406.
  • Because the postmark date of the joint request is within the time
for filing, the joint request was timely filed.
  • At issue
is the Agency’s approval of reimbursement of requested corrective action costs, withmodifications, for Premcor Refining Group’s leaking underground petroleum storage tankfacility located at 3802 Highway 11, Pontoon Beach, Madison County. See 415 ILCS 5/40(a)(1) (2002);35 Ill. IT IS SO ORDERED.I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Boarda...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
PCB 04-040 Order 101603.pdf
4
19887
No
Appears In: PCB 04-040
Preferred Version: PCB 04-040 Order 10/16/03