ILLINOIS POLLUTION CONTROL BOARD
October 16, 2003
PREMCOR REFINING GROUP,
Petitioner,
v.
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
)
)
)
)
)
)
)
)
)
)
PCB
04-40
(UST
Appeal)
(90-Day
Extension)
ORDER OF THE BOARD (by T.E. Johnson):
On October 3, 2003, the parties timely filed a joint notice to extend the 35-day period
within which Premcor Refining Group may appeal an August 25, 2003 determination of the
Illinois Environmental Protection Agency (Agency).
See
415 ILCS 5/40(a)(1) (2002); 35 Ill.
Adm. Code 105.402, 105.406. Because the postmark date of the joint request is within the time
for filing, the joint request was timely filed. 35 Ill. Adm. Code 101.300(b)(2), 105.404. At issue
is the Agency’s approval of reimbursement of requested corrective action costs, with
modifications, for Premcor Refining Group’s leaking underground petroleum storage tank
facility located at 3802 Highway 11, Pontoon Beach, Madison County. The Board extends the
appeal period until December 30, 2003, as the parties request.
See
415 ILCS 5/40(a)(1) (2002);
35 Ill. Adm. Code 105.406. If Premcor Refining Group fails to file an appeal on or before that
date, the Board will dismiss this case and close the docket.
IT IS SO ORDERED.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
adopted the above order on October 16, 2003, by a vote of 7-0.
Dorothy M. Gunn, Clerk
Illinois Pollution Control Board