View Properties

PCB 04-032 Order 09/18/03
ROY STROM BUILDING CORPORATION v. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
The Board granted this request for a 90-day extension of time to file an underground storage tank appeal on behalf of this Lake County facility.
Handle: Document-40246
Owner: Brown, Don (User-14, brownd:DocuShare)DS
Wednesday, September 24, 2003 02:19:38 PM CDT
Friday, October 24, 2003 09:48:43 AM CDT
Modified By:
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
September 18, 2003ROY STROM BUILDING CORPORATION,Petitioner,v.
  • ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,Respondent.
  • Adm.
  • Code 105.402, 105.406.
  • Because the postmark date of the joint request is within the time
for filing, the joint request was timely filed.
  • At issue
is the Agency’s rejection of the corrective action completion report for Roy Strom BuildingCorporation’s leaking underground petroleum storage tank facility located at 43410 KilbourneRoad, Russell, Lake County. See 415 ILCS 5/40(a)(1) (2002); 35 Ill. IT IS SO ORDERED.I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Boardadopted the above ...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
PCB 04-032 Order 091803.pdf
4
9285
No
Appears In: PCB 04-032
Preferred Version: PCB 04-032 Order 09/18/03