ILLINOIS POLLUTION CONTROL BOARD
    September 18, 2003
     
    ROY STROM BUILDING CORPORATION,
     
    Petitioner,
     
    v.
     
    ILLINOIS ENVIRONMENTAL
    PROTECTION AGENCY,
     
    Respondent.
    )
    )
    )
    )
    )
    )
    )
    )
    )
    )
     
     
    PCB 04-32
    (UST Appeal)
    (90-Day Extension)
     
     
    ORDER OF THE BOARD (by T.E. Johnson):
     
    On September 15, 2003, the parties timely filed a joint notice to extend the 35-day period
    within which Roy Strom Building Corporation may appeal an August 5, 2003 determination of
    the Illinois Environmental Protection Agency (Agency).
    See
    415 ILCS 5/40(a)(1) (2002); 35 Ill.
    Adm. Code 105.402, 105.406. Because the postmark date of the joint request is within the time
    for filing, the joint request was timely filed. 35 Ill. Adm. Code 101.300(b)(2), 105.404. At issue
    is the Agency’s rejection of the corrective action completion report for Roy Strom Building
    Corporation’s leaking underground petroleum storage tank facility located at 43410 Kilbourne
    Road, Russell, Lake County. The Board extends the appeal period until December 11, 2003, as
    the parties request.
    See
    415 ILCS 5/40(a)(1) (2002); 35 Ill. Adm. Code 105.406. If Roy Strom
    Building Corporation fails to file an appeal on or before that date, the Board will dismiss this
    case and close the docket.
     
    IT IS SO ORDERED.
     
    I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
    adopted the above order on September 18, 2003, by a vote of 5-0.
     
     
    Dorothy M. Gunn, Clerk
    Illinois Pollution Control Board
     

    Back to top