Because the postmark date of the joint request is within the time for filing, the
joint request was timely filed.
At issue is the
Agency’s approval of reimbursement of requested corrective action costs, with modifications, forPrime Time Citgo’s leaking underground petroleum storage tank facility located at 420 NorthFarnsworth, Aurora, Kane County. See 415 ILCS 5/40(a)(1) (2002); 35 Ill. IT IS SO ORDERED.I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Boardadopted the above orde...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf