ILLINOIS POLLUTION CONTROL BOARD
June 5, 2003
PRIME TIME CITGO,
Petitioner,
v.
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
)
)
)
)
)
)
)
)
)
)
PCB 03-217
(UST Appeal)
(90-Day Extension)
ORDER OF THE BOARD (by T.E. Johnson):
On May 15, 2003, the parties timely filed a joint notice to extend the 35-day period
within which Prime Time Citgo may appeal an April 4, 2003 determination of the Illinois
Environmental Protection Agency (Agency).
See
415 ILCS 5/40(a)(1) (2002), 35 Ill. Adm. Code
105.402, 105.406. Because the postmark date of the joint request is within the time for filing, the
joint request was timely filed. 35 Ill. Adm. Code 101.300(b)(2), 105.404. At issue is the
Agency’s approval of reimbursement of requested corrective action costs, with modifications, for
Prime Time Citgo’s leaking underground petroleum storage tank facility located at 420 North
Farnsworth, Aurora, Kane County. The Board extends the appeal period until August 11, 2003,
as the parties request.
See
415 ILCS 5/40(a)(1) (2002); 35 Ill. Adm. Code 105.406. If Prime
Time Citgo fails to file an appeal on or before that date, the Board will dismiss this case and
close the docket.
IT IS SO ORDERED.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
adopted the above order on June 5, 2003, by a vote of 6-0.
Dorothy M. Gunn, Clerk
Illinois Pollution Control Board