Because the postmark date of the joint request is within the time for filing, the
joint request was timely filed.
At issue is the
Agency’s approval of the high priority corrective action plan budget, with modifications, forHoward Warsaw’s leaking underground petroleum storage tank facility located at WarsawItco/Route 122, Minier, Tazewell County. See 415 ILCS 5/40(a)(1) (2002); 35 Ill. IT IS SO ORDERED.I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Boardadopted the above order on ...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf