View Properties

PCB 72-239 / PCB 72-240 09/06/72 Opinion and Order
ILLINOIS POWER COMPANY (Wood River) v. ENVIRONMENTAL PROTECTION AGENCY / ILLINOIS POWER COMPANY (Vermilion) v. ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-38168
Owner: Site Administrator (User-2, admin:DocuShare)DS
Wednesday, April 2, 2003 08:51:51 AM CST
Thursday, April 10, 2003 09:47:07 AM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
September 6, 1972ILLINOIS POWER COMPANY(Wood River) #72—239v.
  • ENVIRONMENTAL PROTECTION AGENCY
ILLINOIS POWER COMPANY(Vermilion) #72—240v.
  • ENVIRONMENTAL PROTECTION AGENCY
OPINION AND ORDER OF THE BOARD (BY SAMUEL T.
  • LAWTON, JR.)
#72-239 is a request by Illinois Power Company ~o reaffirmand extend the variance Dreviously granted by Orders of the Boardto petitioner with respect to its electric generating units 1, 2and 3 at its Wood River generating plant.
  • Petitioner represents that it has proceeded with the necessary
off—site work on conversion to oil of units 1, 2 and 3 in order topermit commencement of on—...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0001.pdf
4
449399
No
Appears In: PCB 72-239 PCB 72-240
Preferred Version: PCB 72-239 / PCB 72-240 09/06/72 Opinion and Order