ILLINOIS POLLUTION CONTROL BOARD
    September 6, 1972
    ILLINOIS POWER COMPANY
    (Wood River)
    #72—239
    v.
    ENVIRONMENTAL PROTECTION AGENCY
    ILLINOIS POWER COMPANY
    (Vermilion)
    #72—240
    v.
    ENVIRONMENTAL PROTECTION AGENCY
    OPINION AND ORDER OF THE BOARD (BY SAMUEL T. LAWTON, JR.)
    #72-239 is a request by Illinois Power Company ~o reaffirm
    and extend the variance Dreviously granted by Orders of the Board
    to petitioner with respect to its electric generating units 1, 2
    and 3 at its Wood River generating plant. The Original variance
    allowance permitting petitioner to exceed relevant particulate
    emission standards was granted until September 30, 1972. The
    original order was subsequently modified by later orders of
    November 11, 1971 and December 9, 1971.
    Petitioner represents that it has complied with all conditions
    of the orders, as amended and modified, and that it has submitted
    to the Board its commitment to convert units 1, 2 and 3 to No. 2
    Fuel Oil. By its present petition, it represents that it cannot
    commence On—site work on units 1, 2 and 3 until completion of the
    installation of the Cat-Ox system on unit #4, noting that the
    precipitator which constitutes a. part of the Cat-Ox operation,
    went into operation on January 28, 1972.
    Petitioner represents that it has proceeded with the necessary
    off—site work on conversion to oil of units 1, 2 and 3 in order to
    permit commencement of on—site work immediately upon completion
    of the Cat—Ox operation. Petitioner anticipates that conversion
    to oil-burning of units 1, 2 and 3 of the Wood River Station can be
    completed by June 30, 1973 and requests extension of the variance
    with respect to these facilities until that date.
    5
    375

    No recommendation from the Environmental Protection ~\gency
    has been received. We believe the petitioner to be proceeding with
    its program in keeping with our earlier orders, and grant the
    variance to June 30, 1973 accordingly.
    #72-240 is a petition relating to the two units at petitioner’s
    Vermilion electric generating station. Variance from the particulate
    regulations was granted to this facility for Unit #1 until September 30,
    1972, subject to extension to June 30, 1973, and for Unit *2 until
    September 30, 1973, subject to extension to December 31, 1973.
    Petitioner represents that it has complied with the conditions
    of our order and that although work on precipitators for both units
    is in progress, petitioner is .incapable of accelerating the June 30~1973
    date for Unit #1 or accelerating the December 31, 1973 date for
    Unit *2. However, work is continuing on schedule for both precipi-
    tators. The order for Unit #1 precipitator has been placed, support
    structural steel has been contracted for, most engineering has been
    completed and contracts for flue gas duct work and final duct work
    havebeen awarded. On-site construction for the unit *1 precipitator
    commenced on May 1, 1972. A contract for precipitator on unit #2
    has been awarded and final flue gas arrangement studies are in
    progress. Petitioner anticipates that the unit #1 precipitator
    will be installed by June 30, 1973 and the unit #2 precipitator by
    December 31, 1973. Petitioner represents that the variances are
    necessary in order to insure continuity of electric power supply to
    the public. Here again, we believe the petitioner to be pursuing
    the program contemplated in our original order and we extend the
    variance for unit #1, Vermilion Station, to June 30, 1973 and to
    unit #2, Vermilion station, until September 1, 1973, subject to
    the possibility of extension until December 31, 1973.
    No recommendation with respect to this petition has been
    received from the
    Environmental Protection Agency.
    This opinion constitutes
    the findings of fact and conclusions
    of law of the Board.
    IT IS THE ORDER of the Pollution Control Board, as follows:
    1. Variance heretofore gi~anted to Illinois Power Company
    with respect to Wood River units
    #1, 2
    and
    3
    is extended
    to June 30, 1973.
    2. Variance heretofore granted to Illinois Power Company
    with respect to unit #1, Vermilion Station,
    i~
    extended
    to June 30, 1973.
    —2—
    5
    376

    3. Variance heretofore granted to unit #2, Vermilion
    Station, is extended to September 1, 1973, with the
    possibility of extension upon good cause shown to
    December 31, 1973, subject to further Order of the
    Board.
    I, Christan Moffett, Clerk of the Illinois Pollution Control
    Boarô,, certify that the above Opinion and Order was adopted on
    the _____day of September, 1972, by a vote of ~/
    toC~_______
    //