View Properties

PCB 72-401 05/31/73 Order
THE SHERWIN-WILLIAMS CO. v. ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-37244
Owner: Site Administrator (User-2, admin:DocuShare)DS
Monday, March 17, 2003 02:23:18 PM CST
Tuesday, April 22, 2003 01:21:48 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
May 31, 1973THE SHERWIN—WILLIAMS CO.
  • #72—401
v.
  • ENVIRONMENTAL PROTECTION AGENCY )
ORDER OF THE BOARD (BY SAMUEL T~LAWTON, JR.):Petition to modify variance order entered November 21, 1972in the above-captioned case has been filed by The Sherwin-WilliamsCo.
  • Without disposing of the merits of the petition, we extend
the time in which petitioner shall submit engineering drawings andplans for further mercury control on areas of the plant other thanthe Paint Department to the Illinois Environmental Protection Agency,to and including June 7, 1973.
  • IT IS SO ORDERED.
  • I, Christan Moffett, Clerk of ...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0004.pdf
4
96085
No
Appears In: PCB 72-401
Preferred Version: PCB 72-401 05/31/73 Order