PCB 73-273 10/18/73 Opinion and Order
IN THE MATTER OF: THE PETITION FOR VARIANCE OF: RONALD H. AND CAROLYN BOWER
Handle: Document-37080
Owner: Site Administrator (User-2, admin:DocuShare)DS
Thursday, March 13, 2003 03:14:20 PM CST
Thursday, May 15, 2003 11:34:00 AM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
October 18, 1973IN TIlE MATTER OF:THE PETITION FOR VARIANCE OF: ) PCB 73—273RONALD H.
  • AND CAROLYN BOWER )
OPINION AND ORDER OF THE BOARD (by Mr.
  • General obligation bonds totalling $200,000.00
have been approved to defray the cost of the new facility(R.ll).
  • However, various new Agency requirements
resulted in additional plans having to be submitted,each set resulting in additional costs (R.ll).
  • A final
permit to construct was obtained from the Agency onMarch 30, 1973 (R.12).
  • The lowest bid for the proposed
plant, submitted on May 15, 1973, was $527,837.30 (R.13).9— 557 —2-No estimate can be made as to ...