View Properties

PCB 73-034 10/18/73 Opinion and Order
ENVIRONMENTAL PROTECTION AGENCY v. ACME RESIN COMPANY
ENVIRONMENTAL PROTECTION AGENCY v. ACME RESIN COMPANY
Handle: Document-37066
Owner: Site Administrator (User-2, admin:DocuShare)DS
Thursday, March 13, 2003 02:09:52 PM CST
Friday, August 13, 2004 02:38:18 PM CDT
Modified By:
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
October 18, 1973ENVIRONMENTAL PROTECTION AGENCY,Complainant,V.
  • ) PCB 73—34
ACME RESIN COMPANY,Respondent.
  • Respondent employs about 90 people at its Forest Park plant.
  • The relief valves were installed on the weigh tanks about
two years ago CR.
  • The intermediate
product is then transferred to one of the eight dehydrators.
  • The tank
trucks are loaded through 16” diameter manholes located on top ofthe tank trucks.
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
PCB 73-034 10_18_73 Opinion and Order.pdf
4
1001117
No
Appears In: PCB 73-034
Preferred Version: PCB 73-034 10/18/73 Opinion and Order