  • ILLINOIS POLLUTION CONTROL BOARD
March 28, 1974ILLINOIS CENTRAL GULF RAILROAD,Petitioner,v.
  • ) PCB 73—550
ENVIRONMENTAL PROTECTION AGENCY,Respondent.
  • Petitioner states that an analysis of the waste water revealed:
40 mg/l oil, 60 mg/l BOD and 25 mg/l suspended solids.
  • September 7, 1973 Petitioner provided Agency with copy
of Project Completion Schedule forproposed waste treatment facility.
  • Completion of the contract and construction phase of the
project will take at least 12 months.
  • The parties say that a ‘performance bond is neither required
nor recommended”, but it is our custom to require the posting ofbond for the more complex construction pr...