February 28, 1974ALTON BOX BOARD COMPANY,Petitioner,v.
) PCB 74—5
ENVIRONMENTAL PROTECTION AGENCY,Respondent.
The variance which
was first granted in PCB 73—140 contemplates extension fromtime to time while a control program is installed.
Alton Box filed a petition for variance extension on
January 2, 1974.
The hearing was ordered.
Petitioner now requests an interim variance until June 20,
1974 in order to determine the issues and present a full record. Motion for interim variance is denied.I, Christan L. Moffett, Clerk of the Illinois Pollution ControlBoard, hereby certify the above Order was adopted this ~ ...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf