ILLINOIS POLLUTION CONTROL BOARD
    February
    28,
    1974
    ALTON BOX BOARD COMPANY,
    Petitioner,
    v.
    )
    PCB 74—5
    ENVIRONMENTAL PROTECTION AGENCY,
    Respondent.
    ORDER OF THE BOARD
    (by Mr. Henss)
    Petitioner
    is operating
    its plant under the terms
    of
    a
    variance which will expire April
    6,
    1974.
    The variance which
    was first
    granted in PCB 73—140 contemplates extension from
    time to time while
    a control program is installed.
    The
    extension
    of variance depends on the evidence adduced at
    each such request.
    Alton Box filed a petition for variance extension on
    January
    2,
    1974.
    The Agency objected to the variance extension
    and requested
    a hearing.
    The hearing was ordered.
    Petitioner
    now requests an interim variance until June 20,
    1974
    in order to determine the issues and present a full record.
    We
    have not been furnished with proof
    that our hearing schedule
    cannot be
    met
    and
    will
    therefore
    deny
    the
    motion
    for
    interim
    variance and require that the parties proceed to hearing as
    scheduled.
    Motion for interim variance is denied.
    I,
    Christan
    L.
    Moffett,
    Clerk
    of
    the
    Illinois
    Pollution
    Control
    Board,
    hereby certify the above Order was adopted this
    ~
    day
    ~
    1974~by a vote of ~
    toj~.

    Back to top