View Properties

PCB 74-011 11/14/74 Order
COMMONWEALTH EDISON COMPANY v. ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-35575
Owner: Site Administrator (User-2, admin:DocuShare)DS
Tuesday, February 18, 2003 10:34:40 AM CST
Wednesday, April 23, 2003 02:49:09 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
November 14, 1974COMMONWEALTh EDISON COMPANYPETITIONERv.
  • ) PCB 74-11
ENVIRONMENTAL PROTECTION AGENCYRESPONDENTORDER OF THE BOARD (by Mr.
  • These minimum loads are necessary to
prevent damage to the station’s equipment and stacks.
  • Information as
to these problems should appear in the record.
  • 2) Condition 4 (E), relating to the Waukegan Station, is amended
to read as follows:Waukegan Unit 7 shall be operated above its minimum load14 — 403 —2—of 153 megawatts (the amount needed to be maintainedto prevent damage to equipment), only after all available Edison capacity has been utilized, including Waukegan 8, Waukegan 6 a...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0004.pdf
4
285570
No
Appears In: PCB 74-011
Preferred Version: PCB 74-011 11/14/74 Order