November 14, 1974COMMONWEALTh EDISON COMPANYPETITIONERv.
) PCB 74-11
ENVIRONMENTAL PROTECTION AGENCYRESPONDENTORDER OF THE BOARD (by Mr.
These minimum loads are necessary to
prevent damage to the station’s equipment and stacks.
Information as
to these problems should appear in the record.
2) Condition 4 (E), relating to the Waukegan Station, is amended
to read as follows:Waukegan Unit 7 shall be operated above its minimum load14 — 403 —2—of 153 megawatts (the amount needed to be maintainedto prevent damage to equipment), only after all available Edison capacity has been utilized, including Waukegan 8, Waukegan 6 a...