Fairfield sought a time extension from the October 31
Interim Order date on December 12, 1974.
Fairfield presently owns and operates the Fairfield Municipal
Electric Power Plant which supplies the electrical needs of thecompanies and 6,000 residents within a two—mile radius of the City.
The variance was requested
to permit the intermittent operation of its four coal—firedboilers during periods of emergency or when its two diesel generators and the SIPCO tie—line could not supply the needs of consumers.
The quantities and perc...