to comply with the requirements of our Procedural Rule 401.
Petitioner is directed
to supply information, including, but not limited to the followingdata: the average dry weather flow of the treatment plant, thedesigned dry weather flow of the treatment plant, the maximumhydraulic capacity of the treatment plant, the BOD and SuspendedSolids concentration of the effluent and of the receiving stream.
The 90day
decision period set by Section 38 of the Environmental Protection Act shall run from the date of t...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf