| - ILLINOIS POLLUTION CONTROL BOARD
May 25, 1~978VILLAGE OF GLENDALE HEIGHTS, ) Petitioner,v.ENVIRONMENTAL PROTECTION AGENCY,Respondent.- The Petition is inadequate for failure
to specifically request or waive a hearing as required byProcedural Rule 401(b).- The 90—day decision period shall
begin with the filing of the Amended Petition.- IT IS SO ORDERED.
- I, Christan L. Moffett, Clerk of the Illinois Pollution
Control Board, hereby certify the above Order was adoptedon the~’~ day of __________, 1978 by a voteIllinois trol Board30 — 341 |