for it fails to give a clear and complete statement of therelief sought as required by Rule 401(a) (1).
The Board
will not consider a Petition for Variance from the provisionsof the Water Quality Standards of Chapter 3: Water PollutionRegulations unless the Petition makes specific reference tothose Board rules which are necessary for relief.
The 90-day statutory ceriod will begin to run on the
filing of the Amended Petition.
Allowed
Adobe Portable Document Format (.pdf) - application/pdf