grant priority was certified to USEPA on September 7, 1978,Petitioner shall incorporate in any design and specificationadequate provision for the installation of equipment for theremoval of phosphorus which will provide the best practicabletreatment technology for the removal of phosphorus over thelife of the works.
Allowed
Adobe Portable Document Format (.pdf) - application/pdf