ILLINOIc ~OLLtJTION
    CC’NTROL
    T3OARD
    OctoF’er
    19,
    1978
    CITY OF PANA,
    )
    Petitioner,
    v.
    )
    PCB 78—145
    ENVIRONMENTAL
    PROTECTION AGENCY,
    )
    Respondent.
    ORDER OF
    THE
    BOARD
    (by Mr.
    Young):
    On September 26,
    1978, Petitioner filed a Request for
    Clarification of the Board’s Order of July
    6,
    1978.
    The
    Agency filed a response on October
    6, 1978.
    The Order required compliance with paragraph 1-C of the
    Order when grant funds became available.
    since Step II
    grant priority was certified to USEPA on September 7, 1978,
    Petitioner shall incorporate in any design and specification
    adequate provision for the installation of equipment for the
    removal
    of phosphorus which will provide the best practicable
    treatment technology for the removal of phosphorus over the
    life of the works.
    IT
    IS
    SO
    ORDERED.
    I,
    Christan L. r~offett,Clerk of the Illinois Pollution
    Control Board,
    hereby certify the above Order was adopted on
    the
    J~3I~”
    day of
    ________________,
    1978 by a vote of
    4’~
    Illinois Pollution
    Board
    31—677