ILLINOIc ~OLLtJTION
CC’NTROL
T3OARD
OctoF’er
19,
1978
CITY OF PANA,
)
Petitioner,
v.
)
PCB 78—145
ENVIRONMENTAL
PROTECTION AGENCY,
)
Respondent.
ORDER OF
THE
BOARD
(by Mr.
Young):
On September 26,
1978, Petitioner filed a Request for
Clarification of the Board’s Order of July
6,
1978.
The
Agency filed a response on October
6, 1978.
The Order required compliance with paragraph 1-C of the
Order when grant funds became available.
since Step II
grant priority was certified to USEPA on September 7, 1978,
Petitioner shall incorporate in any design and specification
adequate provision for the installation of equipment for the
removal
of phosphorus which will provide the best practicable
treatment technology for the removal of phosphorus over the
life of the works.
IT
IS
SO
ORDERED.
I,
Christan L. r~offett,Clerk of the Illinois Pollution
Control Board,
hereby certify the above Order was adopted on
the
J~3I~”
day of
________________,
1978 by a vote of
4’~
Illinois Pollution
Board
31—677