View Properties

PCB 78-108 10/19/78 Opinion and Order
CENTRAL ILLINOIS PUBLIC SERVICE COMPANY (HUTSONVILLE POWER STATION) v. ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-32299
Owner: Site Administrator (User-2, admin:DocuShare)DS
Monday, January 6, 2003 12:17:55 PM CST
Monday, June 2, 2003 08:53:47 AM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
October 19, 1978CENTRAL ILLINOIS PUBLIC SERVICE ) COMPANY (HtJTSOMVILLE POWER ) STATION) , )) Petitioner,v.
  • ) PCB 78—108
ENVIRONMENTAL PROTECTION AGENCY, )) Respondent.
  • A hearing was held on July 11, 1978.
  • Figures based on 100 percent generation (230 MW) and condenser
cooling water flow of 401 cfs, except for winter when flow is50 percent.
  • During the
period of 1973—1974, a period of relatively normal river flow,significant ecological damage did not occur (p.
  • 4—13). The study
further st...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0001.pdf
4
1181336
No
Appears In: PCB 78-108
Preferred Version: PCB 78-108 10/19/78 Opinion and Order