PCB 78-255 09/21/78 Order
SOUTHERN ILLINOIS POWER COOPERATIVE, INC. v. ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-32256
Owner: Site Administrator (User-2, admin:DocuShare)DS
Monday, January 6, 2003 08:21:55 AM CST
Friday, May 30, 2003 03:20:21 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
September 21, 1’978SOUTHERN ILLINOIS POWERCOOPERATIVE, INC., )) Petitioner,V.
  • ) PCB 78—255
ENVIRONNENTAL PROTECTION AGENCY, )) Respondent.
  • The Petition is insufficient in two
respects.
  • First, it fails to assess the environmental impact
of the requested relief as required by Procedural Rule 401(a) (7).
  • Second, it fails to specifically request or waive a hearing
as required by Procedural Rule 401(b).
  • If these inadequacies
are not corrected within 45 days of the date of this Order,this matter will be subject to dismissal. IT IS SO ORDERED.I, Christan L. Moffett, Clerk of the Illinois PollutionControl Board, he...