August 24, 1978CENTRAL ILLINOIS PUBLIC SERVICE ) COMPANY, Petitioner,v.
) PCB 78—90
ENVIRONMENTAL PROTECTION ) AGENCY, Respondent.
A hearing was held on May 31, 1978.
and induced temperature rise across
the condenser is increased to 34.40°Fat maximum capacity(p.2—i) 31—267 —2—The Thermal Demonstration submitted in this proceedingincludes actual ‘and theoretical plume studies as required byProcedural Rule 603(c).
These studies indicate that the plume
created by Petitioner’s thermal discharge i...