  • ILLINOIS POLLUTION CONTROL BOARD
December 14, 1978SOUTHERN ILLINOIS POWER COOPERATIVE,Petitioner, PCB 78—255ENVIRONMENTAL PROTECTION AGENCY,Respondent.
  • This
unit has an SO2 scrubber which will bring the emissions of the unitinto compliance; however, tile power wiring, control wiring andinstrumentation are not yet convoletelv installed and the scrubberis presently inoperable.
  • The SIPC facility is located on the Lake of Eqypt, approximately
eight miles south of Marion, Illinois.
  • The possibility of such violations
could be minimized through continuous monitoring of loads andresulting boiler operations.
  • Environmental
damage is unlikely while Petitioner would suffer fi...