PCB 78-184 11/16/78 Order
HOMER GRAIN COMPANY v. ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-31950
Owner: Site Administrator (User-2, admin:DocuShare)DS
Monday, December 30, 2002 12:07:13 PM CST
Friday, May 30, 2003 09:26:48 AM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
November 16, 1978HOMER GRAIN COMPANY,Petitioner,v.
  • ) PCB 78—184
ENVIRONMENTAL PROTECTION AGENCY,Respondent.
  • The Petitioner shall begin operation of the
emission control system for Conveyor D-1 by June 30, 1979.
  • If the results of the test
show the equipment is inadequate to meet the requirements of Rule 203(d) (9) the Petitioner shall submit32—107 —2—a construction permit application for an emissioncontrol system to replace these cyclones.
  • Also Petitioner shall make an annual verification
to the Agency of the through-put of dump pit B-2.
  • 6. Within forty—five days of the date of this Order,
Petitioner shall execute and forwa...