ILLINOIS POLLUTION CONTROL BOARD
November 16, 1978
HOMER
GRAIN COMPANY,
Petitioner,
v.
)
PCB 78—184
ENVIRONMENTAL PROTECTION AGENCY,
Respondent.
ORDER OF THE BOARD
(by Dr. Satchell):
It is the Order of the Pollution Control Board that Homer
Grain Company is granted a variance from Rule 203(d) (9) (B)
of
Chapter
2:
Air Pollution Control Regulations
for its Homer,
Illinois,
facility, subject to the following conditions:
1.
The Petitioner shall install an emission control system
on dump pits B-i and B-3 as described in the construction
permit application submitted to the Agency on August 21,
1978,
and Appendix D of the variance petition in accord-
ance with the schedule set forth in paragraph
9 of the
petition.
The Petitioner shall begin operation of the
emission control system for dump pits B-i and B-3 by
June
30,
1979.
2.
The Petitioner shall install an emission control system
on the dry grain conveyor system designated Conveyor D—l
as described in the construction permit application
submitted to the Agency on August
21,
1978 in accordance
with the schedule set forth in paragraph
9 of the
petition.
The Petitioner shall begin operation of the
emission control system for Conveyor D-1 by June 30,
1979.
3.
The Petitioner shall install an emission control system
for the railroad load—out process
as described in the
construction permit application submitted to the Agency
on August 21,
1978
in accordance with the schedule set
forth in paragraph
9 of the petition.
The Petitioner
shall begin operation of the emission control system for
the railroad load-out process by October
31, 1978.
4.
The Petitioner shall test the control efficiency of
the workhouse cyclones.
If the results of the test
show the equipment
is inadequate to meet the require-
ments of Rule 203(d) (9) the Petitioner shall submit
32—107
—2—
a construction permit application for an emission
control system to replace these cyclones.
The emission
control system shall achieve compliance no later than
June
30, 1979.
5.
The Petitioner shall submit to the Agency reports on
the progress of construction certifying whether the
interim compliance steps set forth in paragraph 9 of
the variance petition have been met in a timely manner.
A report shall be submitted within five days after each
of the following dates:
January
1,
1979; April
1,
1979;
July
1,
1979.
Also Petitioner shall make an annual verifi-
cation to the Agency of the through-put of dump pit B-2.
6.
Within forty—five days of the date of this Order,
Petitioner shall execute and forward to the Illinois
Environmental Protection Agency, Variance Section,
2200 Churchill Road, Springfield,
Illinois 62706, a
Certificate of Acceptance and Agreement to be bound
to all terms and conditions of this variance.
This
fonty-five day period shall be held in abeyance for any
period this matter is being appealed.
The form of the
Certificate shall be
as follows:
CERTIFICATION
I,
(We),
having read
and fully understanding the Order in PCB 78-184, hereby accept
that Order and agree to be bound by all of its terms and condi-
tions.
SIGNED _____________________________
TITLE
_____________________________
DATE
______________________________
7.
Final compliance must be achieved by July
1,
1979,
or
Homer Grain will be subject to noncompliance penalties
under Section
120 of the Clean Air Act as amended in
August,
1977
(42 U.S.C.
7401 et seq.).
32—108
—3—
I, Christan
L. Moffett,
Clerk of the Illinois Pollution
Control ~oard,
hereby
the
__________
day of
C
Order was adopted on
_________
1978 by a vote of
~
~~fQrk
Christan
Illinois Pollution Control Board
32—109