First, it fails to describe the length of time for which a
variance is needed as required by Procedural Rule 401(a) (1).
Second, it fails to describe a program whereby Petitioner will
come into compliance with the water quality standards as requiredby Procedural Rule 401(a) (6).
If these inadequacies are not
corrected within 45 days of the date of this Order, this matterwill be subject to dismissal. IT IS SO ORDERED.I, Christan L. Moffett, Clerk of the Illinois PollutionContr...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf