ILLINOIS POLLUTION CONTROL BOARD
    March
    1, 1979
    A
    & G COAL COMPANY,
    Petitioner,
    V.
    )
    PCB 79—40
    ENVIRONMENTAL PROTECTION AGENCY,
    Respondent.
    ORDER OF THE BOARD
    (by Mr. Dumelle):
    On February 26,
    1979 Petitioner requested a variance from
    the water quality standards for sulfate and total dissolved
    solids in Rule
    203(f) of Chapter
    3: Water Pollution of the Board’s
    Rules and Regulations.
    The Petition is deficient in two respects.
    First,
    it fails to describe the length of time for which
    a
    variance
    is needed as required by Procedural Rule 401(a) (1).
    Second,
    it
    fails
    to describe a program whereby Petitioner will
    come into compliance with the water quality standards as required
    by Procedural Rule 401(a) (6).
    If these inadequacies are not
    corrected within 45 days of the date of this Order, this matter
    will be subject to dismissal.
    The statutory 90 day decision
    period shall run from the date an amended petition is filed.
    IT IS SO ORDERED.
    I, Christan L. Moffett, Clerk of the Illinois Pollution
    Control Board,
    hereby certify the abo e Order was adopted on
    the
    _______________
    day of
    ________________,
    1979 by a
    vote of
    11~0
    Illinois Pollution
    33—63

    Back to top