View Properties

PCB 79-115 06/07/79 Order
CITY OF NEOGA v. ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-31615
Owner: Site Administrator (User-2, admin:DocuShare)DS
Monday, December 23, 2002 02:00:32 PM CST
Thursday, June 12, 2003 02:08:03 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
June 7, 1979CITY OF NEOGA, Petitioner,v.
  • ) PCE 79—115
ENVIRONMENTAL PROTECTION AGENCY,Respondent.
  • The Petition
is deficient in several respects.
  • First, it fails to give
a specific timetable for compliance as required by ProceduralRule 401(a)(6).
  • Second, it fails to describe the environmental
impact of granting a variance as requred by ProceduralRule 401(a)(7).
  • Third, it fails to specifically request or
waive a hearing as required by Procedural Rule 401(b). Ifthese deficiencies are not corrected within 45 days of thedate of this Order, this matter will be subject to dismissal. IT IS SO ORDERED.I, Christan L. Moffett, Clerk ...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0009.pdf
4
136908
No
Appears In: PCB 79-115
Preferred Version: PCB 79-115 06/07/79 Order