ILLINOIS POLLUTION CONTROL BOARD
    June
    7,
    1979
    CITY OF NEOGA,
    Petitioner,
    v.
    )
    PCE 79—115
    ENVIRONMENTAL PROTECTION AGENCY,
    Respondent.
    ORDER OF THE BOARD
    (by Mr. Dumelle):
    On May 30, 1979 Petitioner requested a variance from
    Rule 602(b)
    of Chapter
    3:
    Water Pollution.
    The Petition
    is deficient in several respects.
    First,
    it fails to give
    a specific timetable
    for compliance as required by Procedural
    Rule 401(a)(6).
    Second,
    it fails to describe the environmen-
    tal impact of granting a variance
    as requred by Procedural
    Rule 401(a)(7).
    Third,
    it fails to specifically request or
    waive a hearing
    as required by Procedural Rule 401(b).
    If
    these deficiencies are not corrected within 45 days of the
    date of this Order,
    this matter will be subject to dismissal.
    The statutory ninety day decision period shall run from the
    date an amended petition is filed.
    IT
    IS SO ORDERED.
    I, Christan L.
    Moffett, Clerk of the Illinois Pollution
    Control
    Board, hereby certify the above Order was adopted on
    the
    ~-day
    of
    _____________,
    1979 by a vote of
    5-p
    Ck~fa-~-~
    L.
    Christan L.
    Moffett, Cler
    Illinois Pollution Control Board
    34—23

    Back to top