  • ILLINOIS POLLUTION CONTROL BOARD
March 4, 1982MACON SANITARY DISTRICT, ) Petitioner,v.
  • ) PCB 81—193
ILLINOIS ENVIRONMENTALPROTECTION AGENCY, ) Respondent.
  • (Pet.
  • 3).
  • The influent to the facility consists of domestic sewage, inflow,
and infiltration.
  • (Pet. 2—3). Macon,
which is currently in the Step 2 design phase of its constructiongrant program, has anticipated that the requisite plans andspecifications will be completed in January of 1982 and that theconstruction of the new plant will be finished by July of 1983. (Rec, 4). Denial of the requested variance wouldnecessitate the hiring of a Class 3 operator for 18 months untilthe lagoons are ...