View Properties

PCB 83-169 Order 11/18/83
CITY OF HERRIN v. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-29849
Owner: Site Administrator (User-2, admin:DocuShare)DS
Monday, November 25, 2002 09:54:35 AM CST
Monday, November 25, 2002 09:55:18 AM CST
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
November 18, 1983CITY OF HERRIN, Petitioner,v.
  • PCB 83—169
ILLINOIS ENVIRONMENTALPROTECTION AGENCY,Respondent 1~ORDER OF THE BOARD (by J.
  • Theodore Meyer):
Petitioner is required to supply specific figures on thecost of constructing a wastewater treatment facility for the proposed housing; to delineate the anticipated construction schedulefor the low—cost housing program; to identify any current surcharging problems in the vicinity of the proposed construction; to pro-vide a description and cost of lessening the sewer loadingsthrough water conservation devices at the proposed constructionor at existing sewage hook-ups to the same sewer ...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0002.pdf
4
214274
No
Appears In: PCB 83-169
Preferred Version: PCB 83-169 Order 11/18/83