ILLINOIS POLLUTION CONTROL
    BOARD
    November
    18,
    1983
    CITY OF HERRIN,
    Petitioner,
    v.
    PCB 83—169
    ILLINOIS ENVIRONMENTAL
    PROTECTION AGENCY,
    Respondent
    1~
    ORDER OF THE BOARD
    (by J.
    Theodore Meyer):
    Petitioner is required to
    supply
    specific figures on the
    cost of constructing a wastewater treatment facility for the pro-
    posed housing;
    to delineate the anticipated construction schedule
    for the low—cost housing program;
    to identify any current surcharg-
    ing problems
    in the vicinity of the proposed construction; to pro-
    vide
    a description and cost of lessening the sewer loadings
    through water conservation devices
    at the proposed construction
    or at existing sewage hook-ups to the same sewer
    line;
    and to
    address the impact to the existing wastewater treatment facility
    if this variance petition
    is
    granted
    as
    well as that requested
    in PCB 83—161 for existing housing~~
    The Williamson County Housing Authority
    is joined as a neces-
    sary Petitioner pursuant to 35
    Iii,
    Adm. Code 103.141 and 103.121.
    Petitioner, City of Herrin,
    is ordered to serve the Williamson County
    Housing Authority as a party pursuant to 35
    Ill.
    Adm.
    Code 103.123.
    Failure of Petitioner to amend the Petition by complying with
    the forgoing within 45 days of the date of this Order will render
    the Petition subject
    to dismissal for inadequacy.
    (35 Ill. Mm.
    Code 104.125).
    IT IS SO ORDERED~
    Board Members
    B.
    Forcade and J~,Marlin abstained.
    I, Christan
    L. Moffett, Clerk of the Illinois Pollution Control
    Board, hereby certify that the above Order~~wasadopted on the
    M~
    -
    day of
    f~o~-o~--~
    1983, by
    a vote of
    ~
    L.~
    Christan L. Moffe~~J~lerk
    Illinois Pollution Control Board
    54~393

    .

    Back to top