View Properties

PCB 84-164 Order 11/08/84
IN THE MATTER OF: APPLICATION FOR MR. LEO J. HULSEMAN LAKE MICHIGAN PERMIT NO. 1-LM FOR CONSTRUCTION OF PARALLEL SHORELINE PROTECTION PROJECTS IN LAKE MICHIGAN
Handle: Document-28939
Owner: Site Administrator (User-2, admin:DocuShare)DS
Tuesday, November 12, 2002 12:11:32 PM CST
Tuesday, November 12, 2002 12:12:35 PM CST
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
November 8, 1984IN THE MATTER OF:APPLICATION FOR ) PCB 84-164MR.
  • LEO J.
  • HULSEMAN
LAKE MICHIGAN PERMIT NO.
  • 1—LM
FOR CONSTRUCTION OF PARALLEL ) SHORELINE PROTECTION PROJECTS IN ) LAKE MICHIGANORDER OF THE BOARD (by J.
  • D.
  • Dumelle):
Lake Michigan Permit No. 1—LM is hereby approved and theChairman of the Board is authorized and instructed to sign thepermit document. IT IS SO ORDERED.I, Dorothy M. Gunn, Clerk of the Illinois Pollution ControlBoa.~d,hereby certify that the above Order was adopted o~the — Y~ d...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0001.pdf
4
98026
No
Appears In: PCB 84-164
Preferred Version: PCB 84-164 Order 11/08/84