ILLINOIS POLLUTION CONTROL BOARD
November 8,
1984
IN THE MATTER OF:
APPLICATION FOR
)
PCB 84-164
MR. LEO
J.
HULSEMAN
LAKE
MICHIGAN PERMIT NO. 1—LM
FOR CONSTRUCTION OF PARALLEL
)
SHORELINE PROTECTION PROJECTS
IN
)
LAKE MICHIGAN
ORDER OF THE BOARD
(by J.
D.
Dumelle):
Lake Michigan Permit No. 1—LM is hereby approved and the
Chairman of the Board is authorized and instructed to sign the
permit document.
IT
IS SO ORDERED.
I,
Dorothy M. Gunn, Clerk of the Illinois Pollution Control
Boa.~d,hereby certify that the above Order was adopted o~the
—
Y~
day of
_________________,
1984 by
a vote of
~
~
~
~orothy
M. Zunn,
Clerk
Illinois Pollution Control Board
61-67