be a significant typographical omission in the factualstipulation in paragraph 13 concerning three overflow pointsapparently on a sewer line tributary to the Galva northeastplant.
In so ordering, the Board expresses no opinion concerning
the acceptability of the stipulation, preferring to wait untilreceipt of the complete document.
Allowed
Adobe Portable Document Format (.pdf) - application/pdf