CITY OF BENTON v. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
Upon receipt of an Illinois Environmental Protection Agency recommendation, the Board granted this Grundy County facility a 45-day provisional variance, subject to conditions, from the monthly average chlorine residual, total suspended solids, and carbonaceous biochemical oxygen demand effluent limits in its National Pollutant Discharge Elimination System permit number IL0022365, and 35 Ill. Adm. Code 304.120(b) and 304.141(a).
within 2 working days of notification from the Agency.
Adm.
Code 304.120(b) and 304.141(a), subject to the following conditions:
1.
This provisional variance shall begin on October 14, 2002, and continue for 45
days from that date or until completion of the project, whichever occurs earlier. Writtenconfirmation shall be sent within five days to the following address:Illinois Environmental Protection AgencyBureau of Water, Compliance Assurance SectionAttention: Barb Conner1021 North Grand Avenue ...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf